Eldon Court – New Teaching & Training Suites

Eldon
IMG_4121
IMG_4141
IMG_4123
Picture2
Picture1
CLIENT

NHS Foundation

PRINCIPAL CONTRACTOR

Robertson CE Ltd

Services
  • Heat Recovery Ventilation
  • VRF Installation
  • Domestic Services
  • Building Management System
  • Above Ground Drainage
  • Sanitary Ware

 

Gemini Mechanical Services Engineers successfully completed the refurbishment of the old Eldon Court management suite in Newcastle’s city centre. The first-floor redevelopment spans 18,500 sqm and includes offices, training suites, clinical rooms, and breakout areas designed to support NHS staff and other professionals.

Opened in May 2023, Eldon Court has become one of Newcastle’s flagship education centres, offering bespoke, state-of-the-art facilities tailored to both clinical and non-clinical courses.

Outfitted with the latest technology and cutting-edge equipment, the centre provides high-quality, immersive training environments that replicate real-life scenarios in a safe setting.

Notable features of Eldon Court include ward bays, treatment rooms, outpatient consultation spaces, flexible multipurpose training rooms, breakout areas, and a dedicated recording studio. These innovative spaces are thoughtfully designed to cater to diverse training needs, fostering professional growth and excellence.

  • Queen Elizabeth Hospital – Pathology Laboratory

    Gemini recently installed a Reverse Osmosis (RO) water system in the state-of – the – art Pathology Centre, a cutting-edge facility at the forefront of pathology services in the UK. The specialist unit features globally recognised, innovative technology that equips healthcare professionals with the tools necessary for comprehensive medical testing, enabling modern hospitals to deliver […]

    View case study
  • Sunderland University – David Goldman Building

    Gemini were employed to refurbish the existing Boiler plant to include a hybrid LTHW system using natural gas boliers and ASHPs. The project consisted of 4no AIC Boilers, Pumps and Ancillary Equipment including modicications to the existing BMS system. The new system was future proofed to accept a bolt on ASHP arrangement. .

    View case study