New Cadaveric Facility

Cadaveric_Facility_2
CADAV
North Moor House Plant Room
Anatomy
CLIENT

Sunderland University

PRINCIPAL CONTRACTOR

Brims Construction

Services
  • Design & Installation
  • ASHP Heating Installation
  • Hi efficiency AHU Ventilation System
  • Comfort Cooling
  • Hot & Cold-Water Services
  • Building Management System
  • Above Ground Drainage
  • Sanitary Ware Installation

Gemini Successfully Completed  the Mechanical & Plumbing installations for the New multimillion pound facility to help train the medical professionals of tomorrow.

The Centre is key to the newly established school of medicine but will provide vital training for other students within the faculty of Health Sciences and Wellbeing.

Gemini installed hi efficiency ventilation systems to the embalming and prosecting spaces to achieve up to 40 ACH.

Let’s talkMake Enquiry

  • Sunderland University – David Goldman Building

    Gemini were employed to refurbish the existing Boiler plant to include a hybrid LTHW system using natural gas boliers and ASHPs. The project consisted of 4no AIC Boilers, Pumps and Ancillary Equipment including modicications to the existing BMS system. The new system was future proofed to accept a bolt on ASHP arrangement. .

    View case study
  • New College Durham – T.H.E Hub

    Gemini were employed to deliver the MEP to the New technical and higher education building known as the T.H.E Hub which is a modern innovative learning environment. Whilst on site Gemini give valuable Mechanical & Electrical work experience for two T Level Students. The project consisted of 2no roof top plant areas internal and external […]

    View case study