National Glass Centre

IMG_9447
IMG_2189
IMG_2188
CLIENT

Sunderland University

PRINCIPAL CONTRACTOR

Gemini Mechanical Services Engineers

Services
  • Main Contractor
  • Occupied Building/Live Services
  • Gas Fired Boiler Plant Installation
  • Boiler Flue Installation
  • Building Management System
  • Mechanical Ventilation System
  • Electrical Installation
  • All associated Building Work
  • Commissioning

Gemini undertook the role as main contractor to supply and install 2 new Hoval Utragas 500 boilers and 400dia flue venting through the iconic 30m chimney elevating from the site.

Our Project Manager developed a full phasing plan to maintain the operation of the existing system for as long a practical to minimize the shut down period of the heating system.

On completion Gemini undertook Performance Testing of the full installation.

Gemini completed the works in accordance with all relevant building regulation requirements.

  • Sunderland University – David Goldman Building

    Gemini were employed to refurbish the existing Boiler plant to include a hybrid LTHW system using natural gas boliers and ASHPs. The project consisted of 4no AIC Boilers, Pumps and Ancillary Equipment including modicications to the existing BMS system. The new system was future proofed to accept a bolt on ASHP arrangement. .

    View case study
  • New College Durham – T.H.E Hub

    Gemini were employed to deliver the MEP to the New technical and higher education building known as the T.H.E Hub which is a modern innovative learning environment. Whilst on site Gemini give valuable Mechanical & Electrical work experience for two T Level Students. The project consisted of 2no roof top plant areas internal and external […]

    View case study