Downhill Hub

7717-014-Washington-Football-Hub
7731-018-Downhill-Football-Hub
ESH GROUP
Downhill 1
Downhill 3
CLIENT

Leisure United

PRINCIPAL CONTRACTOR

Esh Build

Services
  • Design & Installation
  • Gas Fired Heating Installation
  • HRU Ventilation Systems,
  • Comfort Cooling
  • Domestic Services
  • Building Management System
  • Above Ground Drainage
  • Sanitary Ware Installation

Gemini undertook the role as Sub-contractor to design, install and commission all of the Mechanical and Electrical works.

The Hub received a warm welcome from the local community which provides a fitness gym, full size Class A grass pitch and three, floodlit 3G pitches, Community Cafe and state-of-the-art learning facility. There really is something for everyone.

  • Queen Elizabeth Hospital – Pathology Laboratory

    Gemini recently installed a Reverse Osmosis (RO) water system in the state-of – the – art Pathology Centre, a cutting-edge facility at the forefront of pathology services in the UK. The specialist unit features globally recognised, innovative technology that equips healthcare professionals with the tools necessary for comprehensive medical testing, enabling modern hospitals to deliver […]

    View case study
  • Sunderland University – David Goldman Building

    Gemini were employed to refurbish the existing Boiler plant to include a hybrid LTHW system using natural gas boliers and ASHPs. The project consisted of 4no AIC Boilers, Pumps and Ancillary Equipment including modicications to the existing BMS system. The new system was future proofed to accept a bolt on ASHP arrangement. .

    View case study