Parsons Depot Tyne & Wear

default
A22A9422
A22A9494
A22A9510
DJI_0475
DJI_0477
Client

Sunderland City Council

SOLAR SYSTEM SIZE

411 kWp and 2 MW Battery Storage

Key Benefits
  • Design & Installation
  • Efficiency (Time and Money)
  • Collaboration
  • Health and Safety
  • Export Management

As part of Sunderland Counci’s plan to become carbon neutral by 2030 this building acts as an electrical vehicle charging hub for the council’s fleet of vehicles, utilising a large array of roof mounted solar PV panels and a battery storage unit.

The renewable systems were part of the wider Mechanical and Electrical installations carried out by Gemini for Esh Construction.

An export management control system was also installed to ensure the council consumed all of the energy generated by the solar panels to in turn maximise the benefits and efficiency of the system.

Let’s talkMake Enquiry

  • RVI Hospital Newcastle

    Gemini  were responsible for the design and installation of a ballasted solar system that was installed on the top level of a multistorey car park in the heart of Newcastle city centre. As the system was integrated into the existing electrical infrastructure of a busy hospital  that was open 24 hours a day and 365 […]

    View case study
  • Dean Bank Recreation Park Ferryhill

    Gemini Energy were employed to design, install and certify a Solar PV system with battery storage. The PV system is designed to maximise self consumption by feeding the building with free solar energy. Any excess energy that is generated by the solar panels and not required by the building is typically fed back into the […]

    View case study