RVI Hospital Newcastle

RVI 003
Ballast 2
Switchgear 1
Client

Robertson Construction

SOLAR SYSTEM SIZE

145.96 kWp (356 No. Panels)

Key Benefits
  • Design & installation
  • Maintained a live working environment
  • DNO liaison
  • Collaboration
  • Smart panel technology

Gemini  were responsible for the design and installation of a ballasted solar system that was installed on the top level of a multistorey car park in the heart of Newcastle city centre.

As the system was integrated into the existing electrical infrastructure of a busy hospital  that was open 24 hours a day and 365 days of the year a number of logistical challenges had to be overcome However, the operations team worked in close collaboration with Robertson Construction and the NHS team to ensure the seamless delivery of the project, with minimal disruption.

As part of the design Gemini installed optimisers to each panel to minimize the effects of shading and to maximise the yield for the NHS.

  • Parsons Depot Tyne & Wear

    As part of Sunderland Counci’s plan to become carbon neutral by 2030 this building acts as an electrical vehicle charging hub for the council’s fleet of vehicles, utilising a large array of roof mounted solar PV panels and a battery storage unit. The renewable systems were part of the wider Mechanical and Electrical installations carried […]

    View case study
  • Seaton Valley High School

    This flagship £50 million development has delivered a brand-new, state-of-the-art “super-school,” purpose-built to replace the former Astley Community High School and Whytrig Middle School. Designed to accommodate over 1,000 pupils, the new Seaton Valley School sets a benchmark for modern educational facilities in the UK. Sustainability was a guiding principle in the design. The school […]