RVI Hospital Newcastle

RVI 003
Ballast 2
Switchgear 1
Client

Robertson Construction

SOLAR SYSTEM SIZE

145.96 kWp (356 No. Panels)

Key Benefits
  • Design & installation
  • Maintained a live working environment
  • DNO liaison
  • Collaboration
  • Smart panel technology

Gemini  were responsible for the design and installation of a ballasted solar system that was installed on the top level of a multistorey car park in the heart of Newcastle city centre.

As the system was integrated into the existing electrical infrastructure of a busy hospital  that was open 24 hours a day and 365 days of the year a number of logistical challenges had to be overcome However, the operations team worked in close collaboration with Robertson Construction and the NHS team to ensure the seamless delivery of the project, with minimal disruption.

As part of the design Gemini installed optimisers to each panel to minimize the effects of shading and to maximise the yield for the NHS.

  • Parsons Depot Tyne & Wear

    As part of Sunderland Counci’s plan to become carbon neutral by 2030 this building acts as an electrical vehicle charging hub for the council’s fleet of vehicles, utilising a large array of roof mounted solar PV panels and a battery storage unit. The renewable systems were part of the wider Mechanical and Electrical installations carried […]

    View case study
  • Dean Bank Recreation Park Ferryhill

    Gemini Energy were employed to design, install and certify a Solar PV system with battery storage. The PV system is designed to maximise self consumption by feeding the building with free solar energy. Any excess energy that is generated by the solar panels and not required by the building is typically fed back into the […]

    View case study