Benton Square Industrial Estate

Roof 1
Roof 2
Switchgear 1
Client

P James Construction

SOLAR SYSTEM SIZE

45.51 kWp System with 17.4 kWh storage

Key Benefits
  • Design & installation
  • Efficiency
  • DNO Liaison
  • Collaboration
  • Battery Storage

Gemini Energy were employed by P James Construction to carry out the complete design, installation and certification of a bespoke commercial Solar PV and battery storage system for their offices and warehouse in Newcastle.

As part of the company’s carbon reduction strategy they had already invested in an electric vehicle and charging point and were keen to continue to increase this facility with more EV car charging on site.

With this in mind the company asked Gemini to utilise as much roofspace as possible to install a 45.51 kWp Solar PV system which in summer months would produce excess energy which would be captured in a battery storage system that would in turn feed the building’s electricity load rather than relying on expensive energy from the grid.

  • Parsons Depot Tyne & Wear

    As part of Sunderland Counci’s plan to become carbon neutral by 2030 this building acts as an electrical vehicle charging hub for the council’s fleet of vehicles, utilising a large array of roof mounted solar PV panels and a battery storage unit. The renewable systems were part of the wider Mechanical and Electrical installations carried […]

    View case study
  • RVI Hospital Newcastle

    Gemini  were responsible for the design and installation of a ballasted solar system that was installed on the top level of a multistorey car park in the heart of Newcastle city centre. As the system was integrated into the existing electrical infrastructure of a busy hospital  that was open 24 hours a day and 365 […]

    View case study